|
<prev< First cut & cover tunnel |
>next> Station 2: "Löwenhaus" |
 | Tunnel ramp
|
Following the horizontal alignment, a gradient brings trains to the surface
|
Due to the convex shape of the ramp, a set of pulleys is needed to hold traction cables down
|
When the train approaches, the pulleys must quickly raise in order to leave enough space for the cable grip located under the vehicle
|
10 meters away, the banks of the river Inn
|
|